


During particularly busy times, my mother used to talk about “being as busy as a one-armed paper-hanger.” Lately we have been feeling a bit that way. At the end of March we received the second installment of equipment for the factory we purchased from Laos—another six large trucks packed and over-flowing. And, as always there were a few glitches. Even allowing for extra time, the trucks were delayed by another two days. Then, once loaded, the drivers failed to cover them with tarps and the rainy season decided to make an early appearance. Most of what was inside was not damaged. But some furniture was. Then there were 4 shipping containers that would be extremely useful on this side. But we couldn’t find a Thai trucking company able and willing to send trucks across to get them. So, they are still sitting on the other side, with 400 meters of swiftly-flowing brown water separating us. We would appreciate your prayers on this one! Ruthie.